CO2 calculator how rail saves carbon emissions

Capacity and Equipment

Sofia-Yana Terminal, the 60 000 sq.m. - Storage Space in Numbers

  • Container storage – 20 000 sq m, capacity – 1000 TEU storage, annual capacity, 35 000 TEU
  • Conventional cargo processing area – 40 000 sq m
  • Covered warehouse - rail to road cross docking station – 3000 sq m, 6000 pallet places, with access to a 250 m long rail track
  • Steel products warehouse – 2200 sq m
  • Steel scrap loading and storage station – 10 000sq m
  • Office building and space inc. for rent – 2 x 400 sq m

Terminal Track Lenght - 1,2 km

  • Container trains track length – 2 x 450 m
  • Cross docking conventional trains track length – 250 m:
    –  250 m for conventional wagons
    –  150 m length of loading ramp-to-warehouse
    –  1,2 km length of maneuvering pull-out track
  • The capacity is there to process two block trains per day plus individual or groups of wagons.

Terminal Equipment

  • Two Reach-stackers, 45 t
  • RTG with spreader on second phase after 2011
  • 4 x warehouse fork-lifts & pickers
  • 2 x (one rail and one truck) scales
  • Portable car unloading ramp
  • Metal products lifting equipment, 2 x heavy capacity fork-lifts
  • 4 shunting locomotives
  • Fuel tank
  • Container washing equipment
  • Technical workshop